Forward Pass Calculation Precedence Diagram

logoanimation
Forward Pass Calculations in Precedence Diagram Method (PDM), determine the minimum dates at which each construction activity can be performed and, ultimately, the minimum duration of a construction project. Forward pass is a technique to move forward through network diagram to determining project duration and finding the critical path or Free Float of the project.